Gantt chart maker
Type your tasks with a start date and an end date, or paste them from a spreadsheet, and the chart draws itself. Link tasks that wait on each other, mark the milestones, then save the chart as a picture or take the plan with you as a CSV file.
There's no account to make, and the plan stays in this browser.
Loading the chart maker…
How to make a Gantt chart here
- Add the tasks. One line per task: a name, a start, and an end or a length in days. A group, such as Design or Build, puts related tasks together.
- Or paste them. Copy the columns from Excel or Google Sheets, with or without a header row, and paste them on the task list. The maker reads names, dates and lengths in any column order and asks when it can't tell.
- Link what waits. In Depends on, pick the task that has to finish first. An arrow joins the two bars, and a task that starts too early turns red until you move it, or choose Move after dependencies.
- Mark the milestones. A task with no length is a milestone, drawn as a diamond on its date.
- Pick the scale. Days, weeks or months. Working days only counts lengths without Saturdays and Sundays.
- Take it with you. Download a PNG for a slide, an SVG for a document, or a CSV with every task and date. Print gives you a PDF.
What a Gantt chart shows
A Gantt chart puts time across the top and the tasks down the side. Each task is a bar from its start to its end, so you see at a glance what runs at the same time, what waits for what, and when the work should be done.
- Bars show how long each task takes.
- Arrows show dependencies. Here a dependency means the second task starts once the first is finished, which is the most common kind.
- Diamonds mark milestones: a launch, a review, a deadline.
- The line for today shows what should already be under way.
Tips for a chart people read
- Keep it short. Around 30 lines fit on one screen and one slide. Split a larger plan by phase.
- Plan in weeks when the work runs longer than a month. Days make a long plan hard to read.
- Name tasks as results ("Pricing page live", not "Work on pricing"), so a bar says what is done when it ends.
- Link only real waits. If every task depends on the one before it, nothing can run in parallel, and the chart stops showing the plan's real shape.
When a chart isn't enough
A Gantt chart is a picture of the plan on the day you drew it. When the dates move every week, the picture needs redrawing, and the work itself lives somewhere else.
Upload the CSV from this page to Airsurf Tables and the same rows become a working base. Add a Timeline view to see them on a time axis, a Board to move them by status, or a Calendar. Change a date once and every view follows.
For the work itself, Airsurf Projects keeps issues with a person, a priority and a due date, in a list, a board or a calendar. It also groups the next weeks into cycles with a burn-up chart, and the docs and designs each issue came from stay linked to it.
Tables and Projects are on the free plan, for the whole team, with no price per member. See Pricing.
Questions
Yes. No account, no trial and no watermark on the exports.
No. The chart is drawn in your browser, and your last plan is kept in this browser so it's still there tomorrow. Clear removes it. Copy link puts the whole plan in the link itself, after the #, so it isn't sent to our server when someone opens it.
Yes. Copy the columns and paste them on the task list, or import a .csv file.
Yes. Each task can wait on one or more tasks, drawn as arrows, and a task with no length is a milestone.
Choose Print and save as PDF. The chart fits the page width, landscape.